mirror of
https://mirrors.bfsu.edu.cn/git/linux.git
synced 2024-11-16 08:44:21 +08:00
bd903afeb5
In ctx_resched(), EVENT_FLEXIBLE should be sched_out when EVENT_PINNED is
added. However, ctx_resched() calculates ctx_event_type before checking
this condition. As a result, pinned events will NOT get higher priority
than flexible events.
The following shows this issue on an Intel CPU (where ref-cycles can
only use one hardware counter).
1. First start:
perf stat -C 0 -e ref-cycles -I 1000
2. Then, in the second console, run:
perf stat -C 0 -e ref-cycles:D -I 1000
The second perf uses pinned events, which is expected to have higher
priority. However, because it failed in ctx_resched(). It is never
run.
This patch fixes this by calculating ctx_event_type after re-evaluating
event_type.
Reported-by: Ephraim Park <ephiepark@fb.com>
Signed-off-by: Song Liu <songliubraving@fb.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: <jolsa@redhat.com>
Cc: <kernel-team@fb.com>
Cc: Alexander Shishkin <alexander.shishkin@linux.intel.com>
Cc: Arnaldo Carvalho de Melo <acme@redhat.com>
Cc: Jiri Olsa <jolsa@redhat.com>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Stephane Eranian <eranian@google.com>
Cc: Thomas Gleixner <tglx@linutronix.de>
Cc: Vince Weaver <vincent.weaver@maine.edu>
Fixes:
|
||
---|---|---|
.. | ||
callchain.c | ||
core.c | ||
hw_breakpoint.c | ||
internal.h | ||
Makefile | ||
ring_buffer.c | ||
uprobes.c |