I decided to run my tests on linux-next, and my wakeup_rt tracer was
broken. After running a bisect, I found that the problem commit was:
linux-next commit c365c292d0
"sched: Consider pi boosting in setscheduler()"
And the reason the wake_rt tracer test was failing, was because it had
no RT task to trace. I first noticed this when running with
sched_switch event and saw that my RT task still had normal SCHED_OTHER
priority. Looking at the problem commit, I found:
- p->normal_prio = normal_prio(p);
- p->prio = rt_mutex_getprio(p);
With no
+ p->normal_prio = normal_prio(p);
+ p->prio = rt_mutex_getprio(p);
Reading what the commit is suppose to do, I realize that the p->prio
can't be set if the task is boosted with a higher prio, but the
p->normal_prio still needs to be set regardless, otherwise, when the
task is deboosted, it wont get the new priority.
The p->prio has to be set before "check_class_changed()" is called,
otherwise the class wont be changed.
Also added fix to newprio to include a check for deadline policy that
was missing. This change was suggested by Juri Lelli.
Signed-off-by: Steven Rostedt <rostedt@goodmis.org>
Cc: SebastianAndrzej Siewior <bigeasy@linutronix.de>
Cc: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/20140306120438.638bfe94@gandalf.local.home
Signed-off-by: Ingo Molnar <mingo@kernel.org>